How a data center gets built.

From the first site visit to a live facility, each stage sets up the next. Here is the path in under a minute.

From site selection to power and cooling, in 45 seconds.

Video coming soon

The path

Five stages, one accountable partner.

  1. 01

    Site selection

    Land, fiber, water, zoning and the risk profile of every candidate site, tested before anyone commits.

  2. 02

    Utility

    Securing power: interconnection studies, capacity agreements and a delivery date the program can rely on.

  3. 03

    Building

    Design and construction of the shell, structure and site infrastructure that everything else depends on.

  4. 04

    Equipment

    Long-lead switchgear, generators, UPS and cooling plant, specified, bought and delivered to schedule.

  5. 05

    Power and cooling

    Distribution and cooling systems installed, tested and commissioned until the halls go live.